INTRODUCTION
The Federal Government of Somalia (FGS), through the Ministry of Energy and Water Resources (MoEWR), invites sealed bids from eligible and qualified contractors for the repair, expansion, and modernization of the Bosaso Power Grid in Puntland State. This project aligns with the Somalia Power Master Plan (2018) and is supported by the African Development Bank under its environmental and social safeguard policies.
SECTION 2: SCOPE OF WORK
The proposed works fall under three major components:
1. Power Generation (Renewable Focus):
-
Construction of a 7.15MWp/5.5MW Solar PV Plant
-
Installation of a 3MW/11MWh Battery Energy Storage System (BESS)
-
Distribution of 1,000 standalone solar home systems
2. Power Distribution Network Expansion:
-
Interconnection of currently isolated 11kV and 15kV systems
-
Establishment of new 33kV network (approx. 37.6km overhead + 2km underground cabling)
-
Construction of three 33/11kV substations (East, West, and North)
-
Installation of 40 pole-mounted 11/0.4kV transformers
-
Smart metering for 1,000 commercial/industrial consumers
3. Institutional Capacity Strengthening:
-
Legal and regulatory framework development
-
Training programs for energy sector personnel
-
Provision of technical equipment and operational tools
SECTION 3: ELIGIBILITY CRITERIA
Applicants must:
-
Be legally registered entities authorized to perform the specified works
-
Demonstrate at least 5 years of experience in similar energy infrastructure projects
-
Show financial capacity to deliver a project valued at over USD 25 million
-
Have staff with expertise in renewable energy, electrical engineering, and project management
-
Comply with AfDB’s Integrated Safeguards System (ISS) and Somali EIA regulations
SECTION 4: SUBMISSION GUIDELINES
-
Bidders must submit technical and financial proposals in separate sealed envelopes.
-
Proposals must include:
-
Company profile
-
Evidence of past similar contracts
-
Work plan and implementation schedule
-
ESMP compliance plan
-
Price breakdown
-
Deadline for submission: 30 days from the publication of this tender.
Submissions must be sent to:
The Tender Committee
Ministry of Energy and Water Resources
Federal Government of Somalia
Mogadishu, Somalia
Bosaso-ESIA-Report-20250324-Clean-ver-4-2
SEP-ESPIE-Bosaso-Project-04072025.-Clean-ver-3
SECTION 5: EVALUATION
Bids will be evaluated using a Quality and Cost-Based Selection (QCBS) approach:
-
70% Technical (experience, methodology, personnel, ESG compliance)
-
30% Financial (cost-effectiveness and transparency)
SECTION 6: CONTACT INFORMATION
All inquiries should be directed to:
procurement@moewr.gov.so
Subject: Tender Inquiry – Bosaso Power Grid